Intelligent network cutover centralized scheduling management system and method

A centralized scheduling and intelligent network technology, applied in transmission systems, digital transmission systems, data exchange networks, etc., can solve problems affecting cutover efficiency, large manpower investment, and non-standard cutover schemes, so as to improve cutover efficiency, Strengthen the effect of process control

Inactive Publication Date: 2019-07-23
HANGZHOU EASTCOM SOFTWARE TECH
View PDF6 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] First of all, the traditional cutover preparation process is not standardized, the cutover plan is not standardized, the health check of the cutover network elements, and the system backup are not in place;
[0005] Secondly, it is difficult to verify the traditional cutover operation instructions. When there are many cutover network elements, a lot of manpower is required to check step by step;
[0006] Third, the efficiency of traditional cutover service testing is low. At present, dialing test and billing verification are all manually verified, which takes a long time and greatly affects the efficiency of cutover;
[0007] Thirdly, traditional cutovers are greatly disturbed by human factors, and there are human factors in performance and alarm verification that lead to inspection omissions

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent network cutover centralized scheduling management system and method
  • Intelligent network cutover centralized scheduling management system and method
  • Intelligent network cutover centralized scheduling management system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0035] figure 1 It is a block diagram of an intelligent network cutover centralized dispatching management system, such as figure 1 shown.

[0036] The system includes: acquisition module, preprocessing module, execution module, verification module and comparison module. in,

[0037] The collection module is used to collect cutover applic...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an intelligent network cutover centralized scheduling management system. The system comprises an acquisition module, a preprocessing module, an execution module, a verificationmodule and a comparison module. The invention further discloses a method applied to the management system. The method comprises the steps of creating a work order, generating a record sheet, implementing cutover, carrying out business test verification and comparing on duty. The system has the functions of automatic execution of a cutover preparation link, automatic auditing of operation instructions, automatic checking of business verification and automatic guarding of equipment states, the purposes of improving the cutover efficiency and success rate and enhancing process control are achieved, and visual online management of the whole cutover process is achieved.

Description

technical field [0001] The invention relates to the field of communication equipment network cutover management and monitoring, in particular to an intelligent network cutover centralized scheduling management system and method. Background technique [0002] With the rapid development of mobile services and the rapid growth of the number of mobile users, the requirements for mobile wireless network coverage are getting higher and higher. In order to ensure network quality and improve user experience on the network, operators need to continuously upgrade and expand the network. The number of cutover upgrades is increasing. At the same time, with the development of new services and the evolution of network technology, major changes are taking place in network architecture and operation and maintenance models. The requirements for new service support, full-process control, efficient operation and maintenance, and talent team transformation have brought new challenges to network...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H04L12/24
CPCH04L41/06
Inventor 胡文江许明黄洁吕吉林永兴姜晓辉
Owner HANGZHOU EASTCOM SOFTWARE TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products