Control method forrealizing precision of jacking steel tube arch rib closure based on BIM (building information modeling) technology
A technology of steel pipe arch ribs and control methods, applied in the direction of erecting/assembling bridges, bridge materials, bridges, etc., can solve the problems of lack of intuitive visual reference, many system conversion procedures, and long construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0018] The present invention is described in conjunction with specific embodiment:
[0019] A control method based on BIM technology to realize the closing accuracy of the arch ribs of the jacking steel pipe. The control method adopts BIM technology to realize the jacking of the steel pipe by controlling three factors: before the jacking, after the jacking is in place, before the fitting and closing, and the temperature. The specific steps of the precision control of arch rib closure are as follows:
[0020] 1) Collect measurement data
[0021] Steel pipe arch ribs are made of metal. Affected by the temperature gradient, the horizontal displacement and vertical deflection of steel pipe arch ribs are likely to change. According to the requirements of the design drawings, the construction temperature of the chiseled and repaired section shall be controlled within the range of 15°C to 25°C. Since the construction is under construction in summer, it is advisable to construct th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com