A second lining trolley for tunnel transition section
A technology for the transition section and tunnel, which is applied in the field of the second lining trolley in the tunnel transition section, which can solve problems such as troublesome disassembly, and achieve the effects of reduced replacement, stable support, and shortened construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The present invention will be further described below in conjunction with the accompanying drawings and embodiments, but not as a basis for limiting the present invention.
[0021] Embodiment of the present invention: a second lining trolley in the transition section of the tunnel, as attached Figure 1-5 As shown, a gantry body 1 is included, and the gantry body 1 is the same as the gantry body of the second lining trolley of the standard section. Connection, since the size of the left side of the gradual tunnel section remains unchanged, and the size of the right side is gradually changed, so the left support of the original standard section second lining trolley is maintained, and the right and upper devices are designed and replaced. The specific design and replacement include: the top of the gantry body 1 is connected to the top formwork 5 through the transverse support 4, the transverse support 4 includes a cross bar, both ends of which are connected to the two en...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


