Shield before well construction method of underground comprehensive pipe gallery structure

A technology of integrated pipe gallery and construction method, applied in underwater structures, infrastructure engineering, artificial islands, etc., can solve the problems of long construction period, affecting the penetration time of the pipe gallery, and difficulty in relocating and arranging pipelines. The effect of flexible construction organization and reduced construction period
CN110306592AInactive Publication Date: 2019-10-08TIANJIN MUNICIPAL ENG DESIGN & RES INST

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
TIANJIN MUNICIPAL ENG DESIGN & RES INST
Publication Date
2019-10-08
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
Patent Text Reader

Abstract

The invention discloses a shield before well construction method of an underground comprehensive pipe gallery structure. The method comprises the steps of constructing a joint well enclosure pile, constructing high-pressure jet grouting pile foundation reinforcement, tunneling a shield of a pipe gallery standard section to a node well, cutting a node well enclosing pile, completing the crossing ofthe range of the node well and assembling shield pipe segments, reinforcing 10 adjacent ring pipe segments on the two sides of a well site, breaking the road surface, starting node well foundation pit excavation, drawing and tying the top of the enclosing pile into a ring by using a crown beam, and adopting a reinforced concrete support I for the first road, excavating foundation pits layer by layer from top to bottom, erecting steel supports layer by layer, when the foundation pit is excavated to the top of the shield segment, pouring a reinforced concrete support II and a reinforced concrete purlin, dismantling and hanging the shield segment in the range of the node well, excavating earthwork to the pit bottom, pouring box body concrete of the node well layer by layer from bottom to top, and dismantling the support layer by layer to complete the main body structure of the node well. Construction organization is more flexible, and the construction period of the shield pipe gallery can be greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the structural design of an underground comprehensive pipe gallery, and more specifically relates to a construction method of an underground comprehensive pipe gallery structure of "shield first and well behind". Background technique

[0002] The comprehensive pipe gallery is one of the important symbols of the modernization of new urban municipal infrastructure construction in the 21st century. It avoids the trouble of repeated road excavation due to burying or repairing pipelines. Corrosion prolongs the service life of the pipeline, and it also reserves valuable underground space for the development of the city. However, many underground pipe corridors planned in the old city need to pass through densely populated living areas, urban arterial roads, rivers, bridges, and even pass through buildings. The construction of this type of pipe gallery does not meet the open-cut conditions in consideration of factors such as protecti...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine