Site base of artificial turfs and construction method thereof
A technology of artificial turf and ground, applied in the direction of roads, pavement, roads, etc., can solve the problems of a large number of engineering materials, long construction period, etc., and achieve the effect of reducing consumption, shortening construction time, and increasing drainage capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] Such as Figures 1 to 3 As shown, the present invention discloses a site foundation for artificial turf, including a foundation 1, several prefabricated parts 2 fixed above the foundation 1, and a drainage channel composed of several prefabricated drainage ditches 6.
[0040] The foundation 1 sequentially includes a rammed earth layer 11 , a concrete cushion layer 12 and a concrete layer 13 from bottom to top.
[0041] The prefabricated part 2 includes a bottom plate 21 and a top plate 22 arranged horizontally. Both the top plate 22 and the bottom plate 21 are square, and the area of the bottom plate 21 is smaller than that of the top plate 22 . A support column 23 is disposed between the top plate 22 and the bottom plate 21 , and the bottom plate 21 , the top plate 22 and the support column 23 are integrally formed. The horizontal section of the support column 23 is cross-shaped, and the cross-section of the support column 23 is arranged along the diagonal of the t...
Embodiment 2
[0048] This embodiment discloses a construction method for the site foundation of artificial turf as disclosed in Embodiment 1, comprising the following steps:
[0049] S1: Excavating the earthwork and compacting it to form a rammed earth layer 11, and sequentially pouring a concrete cushion 12 and a concrete layer 13 on the rammed earth layer 11;
[0050] S2: Anchoring the vertically arranged screw rod 3 in the concrete layer 13 according to the design position;
[0051] S3: Screw the adjusting nut 4 on the screw rod 3, and use a measuring tool to control the distance between the bottom end of the nut and the surface of the concrete layer 13;
[0052] S4: Lift the prefabricated part 2 and pass the screw 3 through the installation through hole 221; according to the designed slope, change the slope of the top plate 22 by screwing the adjusting nut 4 at different positions;
[0053] S5: Screw the compression nut 5 on the screw rod 3 and press the compression nut 5 against the u...