Steel arch support connecting member for field tunnel
A technology for connecting parts and steel arches, which is applied in the field of tunnel steel arches, can solve the problems of high erection cost and prolonged tunnel construction time, and achieve the effect of improving the support effect and reducing the extrusion deformation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] Embodiment one: see attached figure 1 And attached Figure 5 , during installation, the second engaging grooves 11 on both sides of the supporting cross bar 1 are engaged on the inner side of the steel arch main body 8, and at the same time, the top ends of the supporting push rod 9 and the side supporting rod 19 are engaged on the inner side of the steel arch main body 8. On the inner side, the second threaded rod 17 at both ends of the support cross bar 1 passes through the support cross bar 1 and the steel arch main body 8, and is fixed by the second limit nut 18, so that the single steel arch main body 8 can be reinforced, and at the same time , multiple steel arch main bodies 8 are inserted from the front of the support cross bar 1 through the connecting mechanism 5 after the installation of the support cross bar 1 is completed, refer to the attached Figure 4, and installing limit pins 6 in the limit holes 502 on both sides of the support cross bar 1 can complete...
Embodiment 2
[0033] Embodiment two: see attached figure 2 , during installation, the second engaging grooves 11 on both sides of the supporting cross bar 1 are engaged on the inner side of the steel arch main body 8, and at the same time, the top ends of the supporting push rod 9 and the side supporting rod 19 are engaged on the inner side of the steel arch main body 8. Then insert it from the front of the support cross bar 1 through the connecting mechanism 5, refer to the attached Figure 4 , and install the limit pin 6 in the limit holes 502 on both sides of the support cross bar 1 to complete the connection of multiple support cross bars 1, and then install the slider 13 on the top of the support bottom column 2 from the slide port 7 Push it into the chute 16, and slide in the chute 16, so that a support bottom column 2 is installed on both sides of the bottom end of the support cross bar 1, and the support bottom post 2 plays a further supporting effect on the support cross bar 1 , ...
Embodiment 3
[0034] Embodiment three, see appendix image 3 , during installation, the second engaging grooves 11 on both sides of the supporting cross bar 1 are engaged on the inner side of the steel arch main body 8, and at the same time, the top ends of the supporting push rod 9 and the side supporting rod 19 are engaged on the inner side of the steel arch main body 8. At the same time, insert it from the front of the support cross bar 1 through the connecting mechanism 5, refer to the attached Figure 4 , and install the limit pin 6 in the limit holes 502 on both sides of the support cross bar 1 to complete the connection of multiple support cross bars 1, and then install the slider 13 on the top of the support bottom column 2 from the slide port 7 Push it into the chute 16, and slide in the chute 16, install a plurality of support bottom columns 2 on the bottom end of the support cross bar 1, and then, place the second support column 2 between adjacent two support bottom columns A co...