An integrated platform door top box structure
A platform door and one-piece technology, applied in the field of rail transit, can solve problems such as many installation steps, difficult management of on-site personnel, difficult rapid construction, and accurate construction, so as to ensure integrity and accuracy, reduce project costs, and shorten projects The effect of duration
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] The following are specific embodiments of the present invention and in conjunction with the accompanying drawings, the technical solutions of the present invention are further described, but the present invention is not limited to these embodiments.
[0025] like Figure 1 to Figure 5 As shown, an integrated platform door top box structure provided by the present invention includes: a mounting beam 100, a plurality of chutes 110 are arranged along the length direction of the mounting beam 100, and a number of A fastener that can slide along the chute 110; several adjustable columns 200 are arranged along the length direction of the installation beam 100 and are located on one side of the installation beam 100, wherein several adjustable columns 200 pass through the fastener It is connected to the installation beam 100, and the upper and lower ends of the adjustable column 200 are respectively connected with the air channel beam and the door machine beam module on the pl...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


