Distribution network black start auxiliary service pricing method considering DG power generation volatility
An auxiliary service and start-up auxiliary technology, applied in the direction of AC network, electrical components, circuit devices, etc. with energy trade/energy transmission authority
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0086] The present invention is guided by the load recovery time signed by the power generation party and each user, first establishes the auxiliary service fee calculation model through the load size, load level and recovery time, and uses the loss caused by the user beyond the recovery agreed time as the compensation for the black start auxiliary service cost. On the premise of knowing the recovery time of each load in 24 hours a day, analyze the game relationship between the power generation party and each user, and aim at the maximum expectation of the total compensation cost of the black start auxiliary service obtained by the power generation party, and solve the problem of the power generation party and each user. Users sign the best black start recovery time to guide the pricing of black start auxiliary services including distributed power distribution network, and encourage power generation to better provide black start auxiliary services.
[0087] Considering the vol...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com