Method and system for recognizing water consuming layer band of oil reservoir in high water cut period
A technology of high water cut period and identification method, which is applied in the direction of earthwork drilling and production, wellbore/well components, etc., can solve the problems of inability to effectively guide the design of regulation and control schemes, poor characterization of high water consumption zones, etc., to achieve easy acquisition, Improve the effect of representation and strong operability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0043] Specific embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are only used to illustrate and explain the present invention, and are not intended to limit the present invention.
[0044] Due to the high water cut period (usually the high water cut period in reservoir engineering can be divided into three stages with different water cuts: the high water cut period with a water cut of 80%-90%, the extra high water cut period with a water cut above 90% , and the late stage of ultra-high water cut with a water content of more than 95%, especially in the late stage of ultra-high water cut), the high water-consumption zone is generally developed in the reservoir, which causes a large amount of injected water to be inefficient and ineffective in circulation, which significantly intensifies the dynamics of the reservoir Heterogeneity enlarges the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


