Management system for temporary ground wire
A management system and grounding wire technology, applied in the field of power grid systems, can solve problems such as potential safety hazards in grounding wire management methods, and achieve the effect of eliminating potential safety hazards
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Embodiment 1, the solution to prevent live wires from being connected to the ground wire:
[0041] When the grounding wire needs to be connected, the power supply of the electrical equipment in the power failure has been disconnected and the switch is pulled to the isolation position. After the signal is transmitted to the electronic operation ticket system, a corresponding switching operation ticket is established. The upper computer of the grounding wire cabinet management receives the switch position signal of the electrical equipment that is powered off by the ECS control system and the switching operation ticket (marking the specific position of the grounding wire suspension), and performs five-proof logic verification on the electrical equipment corresponding to the electronic operation ticket. After passing the five-defense logic verification, the upper computer sends an unlock command to the grounding wire management cabinet to unlock the corresponding grounding ...
Embodiment 2
[0043] Embodiment 2, the scheme to prevent power transmission with ground wire:
[0044] When it is necessary to remove the grounding wire, create an operation ticket for removing the grounding wire, upload the operation ticket information to the grounding wire management host computer for five-proof logic, and issue an instruction to unlock the grounding wire after the verification is successful. The wire is suspended to the corresponding position, and the corresponding equipment is powered after the ground wire returns to its position. The whole operation work avoids the access of human operation and improves the safety factor of operation.
[0045] The specific process is as follows:
[0046] like figure 2 As shown, the temporary grounding line management machine reads the position information of the switch from the ECS; the electronic operation ticket system generates an operation ticket for the power-off state of the electrical equipment;
[0047] The information of the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


