Database completion method of novel power supply rail transit operation and maintenance system
A technology for power supply rails and operation and maintenance systems, applied in the field of database optimization, can solve problems such as short completion time, and achieve the effect of improving the completion effect and high-precision identification and completion processing.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The technical solution of the present invention will be further described in conjunction with specific implementation and examples.
[0029] Such as figure 1 , the specific implementation process and working principle of the present invention are as follows:
[0030] (1) Firstly, the clustering method and the graph structure mining method are used to quickly discover and identify abnormal relationships and unknown relationships in the new power supply rail transit operation and maintenance system. And the preliminary screening results of the abnormal relationship / unknown relationship in the database are obtained. The method is divided into two steps: first, the rail transit database clustering method is used to mine the semantic information in the rail transit operation and maintenance database:
[0031] a) Database clustering first divides the nodes in the database into different sets, and each node forms a corresponding initial set.
[0032] b) Since the rail trans...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com