Quick construction structure for whole bridge and construction method thereof
A construction method, the technology of the whole bridge, applied in the direction of bridges, bridge parts, bridge construction, etc., can solve the problems of shortening the blocking time, and achieve the effects of reducing maintenance costs, reducing workload, and low rigidity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
[0023] Such as Figure 1~3 As shown, a rapid construction structure of an integral bridge includes a corbel 2, a prefabricated abutment 5, a prefabricated bridge girder 7 and a prefabricated buttress 1, and the prefabricated bridge girder is placed on the top of the prefabricated abutment 5, so The side of the upper part of the prefabricated abutment facing the corbel 2 has a raised receiving part 51, the side part of the receiving part 51 has a connecting steel bar 8 extending laterally, and the side part of the prefabricated bridge girder is provided for the connecting steel bar 8 to be inserted into. In this embodiment, the diameter of the insertion hole is consistent with the diameter of the connecting steel bar 8 of the prefabricated abutment 5, and the main girder 7 of the prefabricated bridge is made of UHPC material.
[0024]...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com