Embodiment 1
[0071] Comprehensive treatment project for Xiaoruan-Dongliangge section of Sow River: The comprehensive treatment project for Xiaoruan-Dongliangge section of Shimozhu River is located in the upper reaches of the main stream of Sow River, in Wangtuan Town, Lingang Economic and Technological Development Zone, Weihai. The starting point is located in Xiaoruan Village downstream of Xiaoruan Reservoir, and the end point is the Provincial Highway S303 Bridge, with a total length of 7.5km. The river course is designed according to the standard of a 50-year flood, and the original river course is expanded and excavated. The revetment of the river course adopts three types of gabion gabion, ecological bag and riprap foot protection. After the implementation of this construction method, compared with the traditional process, it avoids the overall filling of cofferdams and drainage, and personnel do not need to construct underwater, which improves construction safety, speeds up constructi...
Embodiment 2
[0073] Xiaoyao River (from Chengda Road to Quanyujia) Ecological Treatment Project in Binhai New Town in the east of Weihai: The river course treatment is designed according to the 50-year flood standard, and dredging and treatment will be carried out on the basis of the original river course. The engineering level is III, etc., the main building is level 3, and the secondary building is level 4. The project is connected to the sea estuary, which is greatly affected by the tide, and the water level is high all year round. During the implementation of the project, there is water in the channel of the Xiaoyao River and the groundwater level is relatively high. When using traditional construction techniques, it is necessary to build cofferdams and carry out drainage, and the construction cost is relatively high. Adopting this construction method greatly saves the engineering cost and shortens the construction period. During the implementation of this project, this construction m...