Capability management method and communication equipment
A technology of capability management and communication equipment, applied in the field of communication, can solve the problem of high transmission overhead of terminal capabilities, and achieve the effect of ensuring reliability and accuracy and reducing overhead
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0184] This embodiment mainly describes the process when the terminal sends the first capability identification information to the CN network element.
[0185] see image 3 ,Such as image 3 As shown, the capability management method in this embodiment may include the following steps:
[0186] Step 1. The terminal may send the first capability identification information to the CN network element through the RAN network element.
[0187] The first capability identifier information may be carried in a NAS (Non-access stratum, non-access stratum) message for transmission, but is not limited thereto.
[0188] CN network element can be AMF, MME or capability management function.
[0189] Optionally, the CN network element may determine whether there is a terminal capability mapped to the first capability identification information in the mapping relationship between the capability identification information and the terminal capability stored in it.
[0190] If the first capabil...
Embodiment 2
[0207] This embodiment mainly describes the process when the terminal sends the first capability identification information to the CN network element.
[0208] see Figure 4 ,Such as Figure 4 As shown, the capability management method in this embodiment may include the following steps:
[0209] Step 1. The terminal sends the first capability identification information to the CN network element through the RAN network element.
[0210] The first capability identification information may be transmitted in NAS (Non-access stratum, non-access stratum), but not limited thereto.
[0211] Optionally, the CN network element may determine whether there is a terminal capability mapped to the first capability identification information in the mapping relationship between the capability identification information and the terminal capability stored in it.
[0212] If the first capability identification information includes the second capability identification information, and there is ...
Embodiment 3
[0228]This embodiment mainly describes the process when the terminal sends the first capability identification information to the RAN network element.
[0229] see Figure 5 ,Such as Figure 5 As shown, the capability management method in this embodiment may include the following steps:
[0230] Step 1. The terminal may send the first capability identification information to the RAN network element.
[0231] The first capability identification information may be carried in the RRC message for transmission, but is not limited thereto.
[0232] Optionally, the RAN network element may determine whether there is a terminal capability mapped to the first capability identification information in the mapping relationship between the capability identification information and the terminal capability stored in it.
[0233] If the first capability identification information includes the second capability identification information, and there is no terminal capability mapped to the sec...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


