Method for nitrogen suction operation under low yield of natural gas of stratum
A natural gas and nitrogen technology, which is used in earth-moving drilling, wellbore/well components, construction, etc., can solve the problems of natural gas easily overflowing wellhead, hidden danger of gas drilling open well operation, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] see figure 1 and figure 2 , a nitrogen pumping operation method under the condition of a small amount of natural gas from the formation, comprising the following steps:
[0037] a. When a small amount of natural gas comes out of the formation and nitrogen drilling operation is performed, close the first flat valve 25, the second flat valve 26, the first suction flat valve 15 and the second suction flat valve 16 in the nitrogen suction system, and open The third flat valve 27, the fourth flat valve 28 and the fifth flat valve 29;
[0038] b. The nitrogen produced by the first nitrogen generating unit 2 enters the low-pressure gate valve group 9 through the first low-pressure gas injection pipeline 20, and the nitrogen produced by the second nitrogen generating unit 3 enters the low-pressure gate valve group 9 through the second low-pressure gas injection pipeline 21, Then enter the booster unit 10 through the low-pressure hose, and enter the rig standpipe 1 through th...
Embodiment 2
[0043] see figure 1 and figure 2 , a nitrogen pumping operation method under the condition of a small amount of natural gas from the formation, comprising the following steps:
[0044] a. When a small amount of natural gas comes out of the formation and nitrogen drilling operation is performed, close the first flat valve 25, the second flat valve 26, the first suction flat valve 15 and the second suction flat valve 16 in the nitrogen suction system, and open The third flat valve 27, the fourth flat valve 28 and the fifth flat valve 29;
[0045] b. The nitrogen produced by the first nitrogen generating unit 2 enters the low-pressure gate valve group 9 through the first low-pressure gas injection pipeline 20, and the nitrogen produced by the second nitrogen generating unit 3 enters the low-pressure gate valve group 9 through the second low-pressure gas injection pipeline 21, Then enter the booster unit 10 through the low-pressure hose, and enter the rig standpipe 1 through th...
Embodiment 3
[0051] see figure 1 and figure 2 , a nitrogen pumping operation method under the condition of a small amount of natural gas from the formation, comprising the following steps:
[0052] a. When a small amount of natural gas comes out of the formation and nitrogen drilling operation is performed, close the first flat valve 25, the second flat valve 26, the first suction flat valve 15 and the second suction flat valve 16 in the nitrogen suction system, and open The third flat valve 27, the fourth flat valve 28 and the fifth flat valve 29;
[0053] b. The nitrogen produced by the first nitrogen generating unit 2 enters the low-pressure gate valve group 9 through the first low-pressure gas injection pipeline 20, and the nitrogen produced by the second nitrogen generating unit 3 enters the low-pressure gate valve group 9 through the second low-pressure gas injection pipeline 21, Then enter the booster unit 10 through the low-pressure hose, and enter the rig standpipe 1 through th...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


