Steel plate for construction machinery and preparation method thereof
A technology for construction machinery and steel plates, applied in the production of thin-gauge high-strength wear-resistant steel, can solve the problems of increased cost, low low-temperature impact toughness and strength, complex process, etc., and achieve the effect of low cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] In this embodiment, the production process of low-cost and high-performance construction machinery steel is molten iron pretreatment, top-bottom combined blowing converter smelting, LF refining, RH refining, slab continuous casting, controlled rolling, and heat treatment.
[0041] The specific operation steps are as follows:
[0042] The blast furnace molten iron is subjected to KR pre-desulfurization operation, the sulfur in the molten iron is controlled within 0.015%, and the slag on the surface of the molten iron is removed after pre-desulfurization. After desulfurization, the molten iron enters the converter for smelting. The temperature of the molten iron entering the furnace is 1254°C. The slag is added 3 minutes before the end point. The time for pressing the gun at the end point is not less than 1 minute. When the molten steel reaches a quarter, add ferromanganese, ferrosilicon, and ferrovanadium for alloying. When the molten steel reaches three quarters, the ad...
Embodiment 2
[0052] In this embodiment, the production process of low-cost and high-performance construction machinery steel is molten iron pretreatment, top-bottom combined blowing converter smelting, LF refining, RH refining, slab continuous casting, controlled rolling, and heat treatment.
[0053] The specific operation steps are as follows:
[0054] The blast furnace molten iron is subjected to KR pre-desulfurization operation, the sulfur in the molten iron is controlled within 0.015%, and the slag on the surface of the molten iron is removed after pre-desulfurization. After desulfurization, the molten iron enters the converter for smelting. The temperature of the molten iron entering the furnace is 1267°C. The slag must be added 3 minutes before the end point. The slag is melted and penetrated throughout the process. The time for pressing the gun at the end point is not less than 1 minute. Inside. When the molten steel reaches a quarter, add ferromanganese, ferrosilicon, and ferrovan...
Embodiment 3
[0063] In this embodiment, the production process of low-cost and high-performance construction machinery steel is molten iron pretreatment, top-bottom combined blowing converter smelting, LF refining, RH refining, slab continuous casting, controlled rolling, and heat treatment.
[0064] The specific operation steps are as follows:
[0065] The blast furnace molten iron is subjected to KR pre-desulfurization operation, the sulfur in the molten iron is controlled within 0.015%, and the slag on the surface of the molten iron is removed after pre-desulfurization. After desulfurization, the molten iron enters the converter for smelting. The temperature of the molten iron entering the furnace is 1340°C. The slag must be added 3 minutes before the end point. The slag is melted and penetrated throughout the process. The time for pressing the gun at the end point is not less than 1 minute. Inside. When the molten steel reaches a quarter, add ferromanganese, ferrosilicon, and ferrovan...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| yield strength | aaaaa | aaaaa |
| tensile strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 