BIM-based whole process consultation method

A whole process and model technology, applied in the field of building informatization, can solve the problems of inconsistency between BIM data and the design stage, poor informatization, and difficulty in consulting, so as to reduce the difficulty of consulting services, control the construction progress, and reduce the number of on-site visas and problems. effect of change

Inactive Publication Date: 2020-04-10
武汉墨斗建筑咨询有限公司
View PDF0 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the construction industry, most of the current design institutes still use two-dimensional floor plans, which have problems such as inefficiency and poor informatization. Even if the design institute is given a BIM model, the construction phase has its own particularity, such as floor-by-floor and stage-by-stage construction. The extraction of material data and other requirements leads to the inconsistency between the required BIM data and the design stage, which makes consultation more difficult and costly

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based whole process consultation method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0040] Such as figure 1 As shown, a BIM-based whole-process consulting method, including:

[0041] Step 1. At the initial stage of the project, use the computer system to compile the project BIM planning document and BIM project management requirements standard documents in combination with the project situation, to determine the organizational framework of the BIM team and the division of labor and work plan of each member;

[0042] Step 2. According to the in-depth requirements of the engineering BIM model, establish the design model, construction model and as-built model, and create corresponding BIM modeling standards for different stages and different depths of BIM model requirements;

[0043] Step 3: Determine the overall BIM implementation plan of the project, and establish a BIM information exchange interface module that supports engineering information sharing, which is used to realize the import of BIM models, the integration of model data in the system, and the inte...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a BIM-based whole process consultation method. The method comprises the following steps of: 1, compiling a project BIM plan book and a BIM project management requirement standard file by using a computer system in combination with the condition of a project at the initial stage of the project, so as to determine the organization framework of a BIM team and the work divisionand work plan of each member; and step 2, establishing a design model, a construction model and a completion model according to the depth requirements of engineering BIM models, and creating corresponding BIM modeling standards and the like according to the requirements of BIM models of different stages and different depths. According to the method of the invention, a drawing problem is solved through the BIM technology; the practical problems of a construction site are solved; the visa and changes of the site are reduced; the quality of construction is improved; the progress of the construction is controlled; engineering cost is saved; project construction file management based on the BIM is provided for a project; and completion data and related equipment data are input into a buildinginformation model, and therefore, the difficulty of consultation service is reduced, and cost is reduced.

Description

technical field [0001] The present invention relates to the technical field of building informationization, and more specifically, relates to a BIM-based whole-process consulting method. Background technique [0002] In the construction industry, most of the current design institutes still use two-dimensional floor plans, which have problems such as inefficiency and poor informatization. Even if the design institute is given a BIM model, the construction phase has its own particularities, such as floor-by-floor and stage-by-stage construction. Extraction of material data and other requirements led to the inconsistency between the required BIM data and the design stage, which made consultation more difficult and costly. Contents of the invention [0003] The purpose of the present invention is to overcome the deficiencies of the existing technology, provide a whole-process consulting method based on BIM, solve drawing problems through BIM technology, solve actual problems o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13G06Q10/06G06Q50/08
CPCG06Q10/06313G06Q10/06315G06Q50/08
Inventor 谭霖
Owner 武汉墨斗建筑咨询有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products