Intelligent construction site management system

A management system, construction site technology, applied in general control systems, control/regulation systems, instruments, etc., can solve the problems of difficulty in ensuring fair and impartial management, low efficiency, low transparency, etc., to prevent equipment from being damaged or even destroyed, saving Labor cost and high transparency

Active Publication Date: 2020-04-21
重庆能工科技发展有限公司
View PDF12 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

There are a lot of equipment and personnel on the construction site, and the management personnel are limited in the management of the site. It is difficult to manage the entire project as a whole, and it is difficult to know the overall construction situation of the site in a timely manner.
It is difficult to effectively supervise the safety of personnel on the construction site and the use of equipment
[0003] At present, the management of the construction site is mainly carried out in the form of a small team, and the bottom management personnel report to the top. On the one hand, this method is not very transparent, and it is difficult to ensure the fairness and justice of the management. In addition, this management method is counted The efficiency is low, and due to the different management habits of each manager, it will be difficult to collect statistics

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent construction site management system
  • Intelligent construction site management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0040] like figure 1 As shown, an intelligent construction site management system includes input unit, collection unit, analysis unit, viewing unit, violation management unit, storage unit and alarm receiving unit.

[0041] Among them, the input unit, viewing unit and alarm receiving unit are integrated on the management end, the acquisition unit is integrated on the acquisition end, and the analysis unit, violation management unit and storage unit are integrated on the server. In this embodiment, the management terminal is a smart phone, the server is a Huawei cloud server, and the collection terminal includes detection elements such as a camera, a gas sensor, a temperature sensor, a smoke sensor, a pressure sensor, and a current sensor. The management terminal and the collection terminal communicate with the server through existing wireless communication methods (such as 5G modules).

[0042] The input unit is used to input the attribute information of the equipment, and is...

Embodiment 2

[0062] Compared with the first embodiment, this embodiment is different in that this embodiment also includes a second collection terminal for collecting images and voices of the construction site, and sending the collected data to the server. The storage unit stores the facial information and phone numbers of the workers, and also stores the interpersonal relationship between workers on the same construction site. The second collection end is a camera and a pickup.

[0063] The server also includes a fight analysis unit, which is used to analyze the data sent by the second collection terminal by means of image recognition and semantic recognition. When the analysis result shows that there is a risk of two people fighting, after identifying the facial information , match the phone numbers of two people, and send preset call messages to them respectively. One of the message content is that the foreman calls to location A, and the other message content is that the supervisor cal...

Embodiment 3

[0071] Different from Embodiment 1, in this embodiment, it also includes intelligent access control. The opening methods of the access control include face recognition, IC card identification and ID card identification. The intelligent access control is integrated with an ID card acquisition unit, a face acquisition unit and IC card acquisition unit.

[0072] It also includes a third collection terminal, which is used to collect the image information of the entrance and exit. The third collection end is a camera.

[0073] The analysis unit is also used to acquire image information from the third acquisition terminal, and identify users entering and exiting the turnstile based on the image information. The analysis unit is used to close the ID card collection unit, the face collection unit and the IC card collection unit when the user is not recognized. When the analysis unit recognizes the user, it is also used to predict the identity verification method of the user. When th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of construction site management, and particularly relates to an intelligent construction site management system. The intelligent construction site management system comprises an input unit, an acquisition unit, an analysis unit, a storage unit and a check unit, wherein the input unit is used for inputting attribute information of equipment and also usedfor inputting basic information of the personnel; the acquisition unit is used for acquiring use information of the equipment, construction information of the personnel and environment information ofthe field; the analysis unit is used for performing project progress analysis by using a preset model according to the data of the input unit and the acquisition unit; the storage unit is used for storing the information input by the input unit, the information acquired by the acquisition unit and an analysis result of the analysis unit; and the check unit is used for checking the information stored in the storage unit. By using the system, a numerous and complicated management system is not needed, so that the labor cost can be saved; and meanwhile, managers can check the equipment information, the personnel information and the environment information through the check unit, layer-by-layer reporting is not needed, the management efficiency is higher, and the transparency is higher.

Description

technical field [0001] The invention belongs to the technical field of construction site management, and in particular relates to an intelligent construction site management system. Background technique [0002] The management of the construction site has always been a headache for the construction party. There are a lot of equipment and personnel on the construction site, and the management of the site is relatively limited. It is difficult to manage the entire project as a whole, and it is difficult to know the overall construction situation of the site in a timely manner. It is difficult to effectively supervise the safety of personnel on the construction site and the use of equipment. [0003] At present, the management of the construction site is mainly carried out in the form of a small team, and the bottom management personnel report to the top. On the one hand, this method is not very transparent, and it is difficult to ensure the fairness and justice of the managem...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G05B19/042
CPCG05B19/0428G05B2219/24024
Inventor 张鑫
Owner 重庆能工科技发展有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products