A test device for studying the tolerance fit of industrial building parts
A technology of tolerance matching and testing equipment, which is applied in the direction of measuring equipment, buildings, building components, etc., can solve the problems of ununiform fit gap size and tolerance range size, no rationality of technical data, lack of systematic research and related specifications, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031]A test apparatus for studying the tolerance of industrial construction section, including two fixed walls, opposing two moving walls, all of which have a bottom plate and a top plate of the intersecting track, and the improvement is: the two The moving wall is in contact with the adjacent fixed wall, and the two moving walls each include a plurality of vertical side-by-side wall units, each wall unit, movable along the track, adjacent wall unit. A fitting member having mutually mutually mutually immobilized adjacent wall units; the wall unit includes a first wall, a second wall, and a third wall in which a second wall is sequentially connected. The second wall is passed through a rotating member. Connect to the first wall to enable the second wall to flip relative to the first wall, the third wall through the adjustment member to the second wall of the second wall so that the third wall relative to the surface of the second wall The flatness can be adjusted.
[0032]In the presen...
Embodiment 2
[0034]Based on the first embodiment, the two fixed walls are vertically side and arrange a plurality of second walls vertically and vertically opposed to the two moving walls, the second wall being connected to the fixed wall through the rotating member. The second wall can be flipped relative to the fixed wall, the second wall being coupled to the third wall of the third wall to adjust the surface flatness of the third wall relative to the second wall.
[0035]In this embodiment, the deformation of the construction section component is simulated by the second wall of the construction section components by the second wall to simulate the deformation of the construction section components by the second wall.
Embodiment 3
[0037]Based on the first or 2, the second wall is spliced from a plurality of second wall units, each of which is connected to the first wall through the rotating member to make the second wall. The body unit can be flipped relative to the first wall.
[0038]In this embodiment, the second wall is spliced by a plurality of second walls, which can sufficiently simulate the deformation of the building part components, such as the unevenness generated by the surface due to construction of the wall surface due to construction. Uneven situation.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 