Construction method of water supply pipeline

A construction method and technology for water supply pipelines, which can be used in pipeline laying and maintenance, pipe/pipe joints/pipe fittings, and by detecting the appearance of fluid at leakage points, which can solve problems such as inability to deploy, increase material loss, and labor intensity. , to achieve the effect of improving the efficiency of construction and construction cost, speeding up the interface speed, and shortening the construction period of the project

Active Publication Date: 2020-04-24
QINGDAO HUADE METER MFGD & ENG CO LTD
View PDF9 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

It is extremely uneconomical from an economic point of view to keep the excavator on the construction site waiting for excavation or to re-enter the site (the excavator may have left the construction site at this time). It usually takes 7-10 days to complete the pounding), therefore, if manual excavation is used, due to the small construction area in this section, no amount of manual work can be performed. Taking the four types of soil as an example, excavation It takes about 3.5-5 man-days to manually remove the unreinforced concrete. In addition, the cost of raw materials for the concrete between the two construction sections, the curing period of the concrete, and the cost of the concrete The indirect economic cost and labor cost added to the construction unit by demolition, as well as the cost of transporting the demolished concrete to the garbage plant are also relatively expensive. Water leakage has left a great hidden danger for the safe and normal operation of this section of the pipeline in the future
Because first, the connecting pipes that were flashed out for pound pressure were not tested for pound pressure
Secondly, the construction time of the two construction sections is generally not at the same time. Therefore, it is difficult to ensure that the horizontal and vertical positions of the two sections of pipelines constructed before and after the construction are consistent, which increases the leakage of some pipelines that have not been pounded. possibility
If there is a big difference between the horizontal and vertical positions of the two pipelines, in order to ensure a better connection of the pipelines, the installed pipelines have to be removed, and longer pipelines are used for leveling or slope finding, which again causes engineering problems. Delay in construction period
Third, since there is a section of trench that was not excavated at the same time, it is difficult to directly connect with fixed-length pipes without cutting the pipes to find the distance when connecting the pipes, which increases the loss of materials and prolongs the connection time , the labor intensity of the interface is high

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0073] Embodiment: for the construction method of a kind of water supply pipeline disclosed by the present invention, comprises the following steps:

[0074] Step 1, setting out and inspecting the line

[0075] According to the requirements of the design drawings, use colored paint to draw the center line of the pipe on the road, and use a dotted line to indicate it. After the self-test is passed after setting out, draw a 30cm long line segment every 1m. Every 30m, use colored paint to mark the pile number on The pavement can only be constructed after passing the inspection and acceptance.

[0076] Step 2. Trench excavation

[0077] The trench bottom width and grading shall be excavated in accordance with the current national norms and industry standards, artificially assisted with mechanical excavation, and the remaining soil shall be transported along with the excavation. The pile numbers shall be marked on the obvious places on both sides of the trench with a distance of 3...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a construction method of a water supply pipeline. The construction method comprises the following steps of 1, setting out and line inspecting; 2, trench excavation; 3, pipeline mounting; 4, carrying out a pipeline experiment and a leakproofness experiment; 5, pipeline backfilling; and 6, inspection well periphery backfilling. The construction method has the beneficial effects that the experiment period of a water supply pipeline pressure test can be effectively shortened, and the cost of the test can be effectively reduced.

Description

technical field [0001] The invention relates to the technical field of pipeline construction, in particular to a water supply pipeline construction method. Background technique [0002] According to the provisions of Article 9.1.9 of the "Code for Construction and Acceptance of Water Supply and Sewerage Pipeline Engineering" (GB50268-2008), the segmental length of the water supply pipeline hydraulic test should not be greater than 1000m. However, in the construction process of large-diameter water pipelines, the construction length of a bid section or a project pipeline is often relatively long. In the construction process, we often use 1000m as a construction section, or according to the actual situation on site, we intentionally divide the large-diameter water supply pipe of about 1,000 meters into two sections for construction, so it must comply with (GB50268-2008) 9.1.9 According to the regulations, we have to carry out multiple pressure tests on the new pipeline, and t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): F16L1/036F16L1/06G01M3/04
CPCF16L1/036F16L1/06G01M3/04
Inventor 路维福刘骞魏延玲
Owner QINGDAO HUADE METER MFGD & ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products