A construction method for artificial dual-domain islands with increased freshwater storage
A construction method and island technology, which can be used in water filling, infrastructure engineering, construction, etc., can solve the problems of reducing the cost performance of the island and increasing the investment cost, and achieve the effect of exempting costs, reducing project costs, and increasing freshwater reserves.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The technical solutions of the present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0022] A construction method for an artificial double-domain island with increased freshwater storage, comprising the following steps:
[0023] Step 1. Divide the island matrix part and the water-blocking barrier part in the artificial island; specifically, simplify the three-dimensional island into a two-dimensional section, and set up a water-blocking barrier part that does not completely penetrate the aquifer of the island on the periphery of the planned reclamation island.
[0024] Step 2, design the permeability coefficient of the sea island matrix part, the permeability coefficient and the thickness of the water blocking barrier part; the permeability coefficient of the sea island matrix part is K 1 , The permeability coefficient of the water blocking barrier part is K 2 , satisfying K 2 / K 1 The value of is in the in...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap