A peak-shaving energy storage system for new energy solar power generation
An energy storage system and solar energy technology, applied in the field of new energy power generation, can solve the problems of equipment scrapping, salt cooling and solidification, etc., and achieve the effect of increasing the compression ratio
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] Such as figure 1 As shown, the present invention is a peak-shaving energy storage system for new energy solar power generation, including a photothermal conversion device 1. After being heated, the photothermal conversion device 1 transmits steam to a program-controlled valve 2, and the program-controlled valve 2 transmits part of the steam to the steam turbine. Group 3 generates power, and the steam higher than the load demand is pressurized and stored in the pressure-resistant insulation warehouse 5;
[0044] When the input steam pressure of the steam turbine unit 3 is not enough to meet the load demand, the pressure-resistant heat preservation warehouse 5 delivers high-pressure steam to it.
Embodiment 2
[0046] Such as figure 1 As shown, a peak-shaving energy storage system for new energy solar power generation includes a photothermal conversion device 1. After being heated, the photothermal conversion device 1 transmits steam to a programmable valve 2. The programmable valve 2 includes three programmable switches 21, 22, twenty three;
[0047] The first programmable switch 21 communicates with the light-to-heat conversion device 1;
[0048] The second program-controlled switch 22 communicates with the steam turbine unit 3;
[0049] The third program-controlled switch 23 communicates with the pressurizer 4, and the pressurizer 4 stores the steam pressure into the pressure-resistant heat preservation bin 5;
[0050] Such as Figure 2-3 As shown, the compressor 4 includes a pressure-resistant tube 41 communicating with the third programmable switch 23. The pressure-resistant tube 41 is connected in parallel with a large pressure cylinder 42 and a small pressure cylinder 43 in...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


