A technology of arch structure and arch structure, which is applied in the direction of tunnel, tunnel lining, shaft equipment, etc., can solve the problems of troubled construction safety and lagging construction period, affecting the passage of construction vehicles, endangering the safety of people, etc. The effect of increasing stiffness and increasing the ability to resist buoyancy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] In a typical embodiment of the present invention, such as Figure 1 to Figure 4 As shown, a tunnel inverted arch structure with anti-floor drum, including arch foot locking anchor 1, anti-floating anchor 2, prestressed anchor 5, self-drilling hollow grouting anchor 4, foam concrete layer, reinforced concrete The main body of the inverted arch structure 8 is formed after the pouring of the reinforced concrete layer. A mortise and tenon structure is set at the connection surface with the cast-in-place secondary lining 9 to make the two more closely combined; a steel joint 3 is reserved between the main body 8 of the inverted arch structure and the secondary lining 9, and the rigidity of the structure is increased by using steel bars to connect , Strengthen the anti-deformation performance.
[0031] In this example, please refer to figure 1 , figure 1 A sectional view showing the main structure of this embodiment is shown, and the orientation in this figure is used as a...
Embodiment 2
[0043] In a typical implementation of the present invention, a construction method of a floor drum-resistant tunnel inverted arch structure is disclosed, comprising the following steps:
[0044] 1) Tunnel excavation, construction initial support;
[0045] 2) After the initial support construction is completed, the inverted arch is excavated, leveled and treated for the base, and the prestressed anchor rods 5 are installed, and the prestressed anchor rods 5 are installed at the arch feet on both sides of the tunnel;
[0046] 3) Drilling self-drilling prestressed anchor rods 4, symmetrically distributed with respect to the central axis of the tunnel, and grouting after the drilling is completed;
[0047] 4) Set up arch foot locking anchor 1 and anti-floating anchor 2;
[0048] 5) Fill the foam concrete base cushion 10, and add an appropriate amount of carbon fiber to improve the strength;
[0049] 6) Pour reinforced concrete 8, reserve drain holes and steel bar joints 3 on bot...