Embodiment 1
[0047] Such as Figure 1 to Figure 3 The drill pipe mud scraper shown for rapid drilling under complex well conditions includes fasteners 1 for detachable connection to the fixed equipment on the drill floor, mounting parts 3 for installing mud scraping rings 2, and It includes an elastic member 4 connected between the fastener 1 and the mounting part 3; the mud scraping ring 2 is an unclosed ring structure, and the two ends of the mud scraping ring 2 are fixed ends and movable ends respectively. The end is fixedly connected to the mounting part 3, and the movable end is detachably connected to the mounting part 3; when there is no external force, the inner diameter of the mud scraping ring 2 is smaller than the outer diameter of the drill pipe to be scraped.
[0048] In this embodiment, the fastener 1 is preferably a throat hoop or a hoop, and the elastic member 4 is preferably a nylon elastic cord or a belt.
[0049] In this embodiment, the detachable connection between the...
Embodiment 2
[0054] The drill pipe mud scraper used for rapid drilling under complex well conditions is different from Embodiment 1 in that the detachable connection between the movable end and the mounting part in this embodiment is through the chute 7, the slider 8, and the sinker 9 achieve together. Specifically: the surface of the mounting part 3 is provided with a chute 7, and one end of the chute 7 communicates with a sinker 9; the movable end is fixedly connected with a slider 8 that matches the chute 7, and the slider 8 can enter and exit said chute 7 from sinker 9.
[0055] Figure 4 and Figure 5 An embodiment is illustrated: the chute 7 is a dovetail chute, and the chute 7 is in a "U" shape, which may also be called an "η" shape. Image 6 shown with Figure 5 The slide block 8 structure that middle chute 7 matches.
[0056] Figure 7 Another embodiment is illustrated: the chute 7 is a T-shaped groove, and the chute 7 is "U"-shaped, which can also be called "n"-shaped. Fi...
Embodiment 3
[0061] Such as figure 2 and image 3 The shown drill pipe mud scraper for rapid drilling under complex well conditions, on the basis of any of the above-mentioned embodiments, the mounting part 3 includes side one and side two perpendicular to each other, the fixed end, the movable side The ends are connected to side one and side two respectively. Such as image 3 In the embodiment shown, the projection of the mud scraping ring on the horizontal plane can form a substantially closed circle, thus ensuring sufficient mud scraping effect on the outer wall of the drill pipe.
[0062] As shown in the figure, in this embodiment, when the mud scraping ring is set on the drill pipe, the drill pipe is vertical, the mud scraping ring is basically horizontal, the side one is facing the direction of the drill pipe, and the side two is located on the upper surface of the mounting part 3;
[0063] Of course, the second side can also be the lower surface of the mounting part 3, but the s...