Integrated bathroom and mounting method thereof
An integral bathroom technology, applied to bathtubs, showers, window decorations, etc., can solve the problems of large range of motion, large space required for manipulation, and impact on the placed objects on the door panel 13, achieving high installation efficiency and convenient operation Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] refer to figure 1 , is an integral bathroom disclosed in the present invention, which includes a main body 1, a curtain 11 and a baffle 12, the side wall of the main body 1 is provided with a reserved hole 10 along the horizontal direction, and the baffle 12 is located at the bottom of the inner side of the reserved hole 10, The bottom of the baffle 11 is located inside the baffle 12 , and the baffle 12 is used to block the opening of the reserved hole 10 . The bottom wall of the baffle 12 and the two side walls in the horizontal direction are fixed with the inner wall of the reserved hole 10 by gluing, so as to realize the partition of water accumulation at the bottom of the inner side of the main body 1 .
[0045] refer to figure 1 The inner wall of the reserved hole 10 is connected with a connecting component 2. The connecting component 2 includes a sliding rod 21. The sliding rod 21 includes a supporting rod 31 and a supporting rod 2 32. The supporting rod 1 31 a...
Embodiment 2
[0053] An integrated bathroom installation method disclosed in the present invention includes the following steps:
[0054] S1. Pre-process the main body 1, the sliding rod 21, the curtain 11 and a number of collars 22 for spare use, process reserved holes 10 on the side wall of the main body 1, process a number of connecting holes 110 on the top of the curtain 11, and process some connection holes 110 in the middle of the collars 22 A section of processing and installation gap 220;
[0055] S2, inserting the top of the curtain 11 into the inside of the collar 22 from the installation gap 220, and making several collars 22 and the corresponding connection holes 110 buckle;
[0056] S3, sleeve the several collars 22 to the outer side of the sliding rod 21 in turn;
[0057] S4. Place the sliding rod 21 horizontally, and connect the two ends of the sliding rod 21 to the top of the inner side wall of the reserved hole 10 by bolts.
[0058] The working principle of the above embo...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


