Shield receiving well foundation pit excavation and supporting non-precipitation construction method
A construction method and technology for receiving wells, which are used in excavation, infrastructure engineering, sheet pile walls, etc., can solve problems such as no precipitation, and achieve the effects of reducing impact, ensuring dry tank operation environment, and ensuring safety.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] This embodiment is the excavation construction plan of the shield receiving shaft in the south section of Qinghe Station of the branch line of Line 19. The branch line of Line 19 is a reserved line at the north and south ends of Qinghe Station. The reserved section on the south side is constructed by shield tunneling and underground excavation. The section is set up with a shield tunnel in the southeast quadrant of the intersection of Jingxin Expressway and Xiaoying West Road. The site is currently an open space, about 53.1m away from the nearest point of Metro Line 13 on the west side, and 20.3m away from the drop-down trough of the auxiliary road of Xiaoying West Road on the north side, and there is no pipeline in the site. The shield receiving shaft of the branch line of Line 19 is located in the southwest quadrant of the intersection of North Fifth Ring Road and Maofang Road, and the current situation is mainly green land. There are no pipelines on site. The design...
Embodiment 2
[0043] This embodiment 2 is an improvement made on the basis of embodiment 1. It is another embodiment of the present invention to construct the water-stop curtain at the bottom of the foundation pit first, then to construct the bored piles on the side wall of the foundation pit, and then to construct the water-stop curtain on the side wall of the foundation pit. The specific plan is as follows:
[0044] A construction method for excavating and supporting a foundation pit of a shield receiving well without precipitation, comprising the following steps: S1: performing grouting on the bottom of the foundation pit of a shield receiving well to stop water to form a water-stop curtain at the bottom of the foundation pit; S2: According to the boundary line direction of the foundation pit excavation area of the receiving well of the shield machine, a plurality of bored piles are placed according to a given interval, and the multiple bored piles are distributed in a circular array t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com