Tram track hot cutting deicing device
A tram track and thermal cutting technology, applied in track cleaning, construction, cleaning methods, etc., can solve the problems of multiple resources, heat waste, and heat consumption, so as to reduce collisions, reduce the degree of adhesion, and reduce the degree of adhesion. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] see Figure 1-4 , the present invention provides a technical solution: a thermal cutting and deicing device for tram tracks, including a fixed plate 1, a bracket 2 is fixedly connected to one end of the bottom of the fixed plate 1, and a drive motor 3 is fixedly connected to one side of the inner wall of the bracket 2, and the drive motor 3 The drive shaft runs through the support 2 and is fixedly connected with the drive gear 4. The drive shaft of the drive motor 3 is rotationally connected with the support 2 through bearings. One side of the drive gear 4 is meshed with a driven gear 5, and one side of the driven gear 5 is fixedly connected with a drive shaft. 6. The end of the transmission shaft 6 away from the driven gear 5 runs through the bracket 2 and is fixedly connected with the first heating rod 7, which can transfer the generated heat to the cutting disc 8, so that the cutting disc 8 can cut the ice layer at the same time. The melting of the surrounding ice la...
Embodiment 2
[0033] see Figure 1-5, on the basis of Embodiment 1, the present invention provides a technical solution: a thermal cutting and deicing device for tram tracks, including a fixed plate 1, the end of the fixed plate 1 far away from the bracket 2 is fixedly connected with a fixed seat 12, and the bottom of the fixed seat 12 Fixedly connected with a fixed frame 13, the bottom of the fixed frame 13 is rotatably connected with an ice shoveling frame 14, and the bottom of the inner wall of the ice shoveling frame 14 is fixedly connected with a lifting plate 15. When inside the frame 14, the newly entered ice cubes push the previously entered ice cubes to move behind the ice shoveling frame 14. When the ice cubes want to move behind the ice shoveling frame 14, they are lifted by the lifting plate 15. When 14 is at the rear, the lifting plate 15 lifts the ice cubes to the top of the ice shoveling frame 14, and the top of the lifting plate 15 is fixedly connected with a guide cone 16. ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 