Construction method of pilot hole smooth blasting and blasting hole positioning device
A construction method and technology of positioning device, applied in blasting and other directions, can solve the problems of position deviation of blasting holes and poor blasting effect, and achieve the effects of improving accuracy, reducing inaccurate position of blasting holes, and improving stability.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] Embodiment 1 is a construction method for pilot hole smooth surface blasting disclosed by the present invention, which includes the following steps:
[0033] Step 1. Calculate the size, quantity, hole depth and spacing of the required blasting holes according to the size of the blasting surface and form the design drawings;
[0034] Step 2: Determine a center point on the blast surface according to the design drawing, and then use the positioning device to locate the blast hole according to the design drawing and drill the hole;
[0035] Step 3, filling the drilled blast hole with explosives and evacuating personnel;
[0036] Step 4, detonate, and clean up the blast surface after detonation, and design the next blast according to the detonation situation.
Embodiment 2
[0037] Embodiment two, such as figure 1 As shown, a positioning device for a blast hole includes a reference rod 1, a mounting rod 2, a positioning ring 4, a scale 3, an adjustment mechanism 5, and an adjustment member 6. The reference rod 1 is fixedly connected to the blasting surface through an expansion bolt. The rod 1 is arranged horizontally, one end of the installation rod 2 is connected to one end of the reference rod 1 through a hinge, the positioning ring 4 is installed on the outer wall of the installation rod 2, the scale 3 is fixedly connected to the outer wall of the installation rod 2, and the scale 3 is along the Set along the length direction of the installation rod 2, the adjustment mechanism 5 is arranged between the positioning ring 4 and the installation rod 2, the adjustment mechanism 5 is used to adjust the position of the positioning ring 4 on the installation rod 2, and the adjustment member 6 is arranged between the installation rod 2 and the reference ...