Cofferdam construction method and cofferdam structure
A construction method and cofferdam technology, which is applied in infrastructure engineering, sea area engineering, water conservancy engineering, etc., can solve problems such as cofferdam stability and barrier defects, and achieve the effect of ensuring water-retaining performance and improving stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] Such as figure 1 Shown in, a kind of cofferdam construction method comprises the following steps:
[0046] 1) Filling of underwater dike 1:
[0047] Adopt the "flat plugging method", and carry out layer-by-layer throwing and filling in the order of "first far and then advance, first deep and then shallow";
[0048] 2) The cavity slag reverse filter material 2 filling inside the weir body:
[0049] Use the "invasion method" to fill the hole slag reverse filter material 2 along the inner side of the embankment 1. After the filling is completed, use a vibrating roller to carry out strong vibration rolling compaction;
[0050] 3) Soil and rock backfill 3 filling:
[0051] The earth-rock backfill 3 is filled in two layers. After the filling of the lower earth-rock backfill 3 is completed, the upper layer of earth-rock backfill 3 is filled to the design elevation after the anti-seepage wall 6 is completed;
[0052] 4) Construction of anti-seepage wall 6:
[0053] The per...
Embodiment 2
[0068] On the basis of embodiment 1, cofferdam observation and cofferdam demolition construction are also included:
[0069]After the cofferdam observation is completed, a settlement observation point is respectively set at the two inflection points on the back water surface of the cofferdam, and 50cm×50cm is reserved at the two inflection point positions of the cofferdam during the construction of the sprayed concrete slope protection 10 on the back water side. space for setting settlement observation points;
[0070] Described cofferdam demolition construction comprises the following steps:
[0071] 1) Drop the trash rack and working gate at the water inlet;
[0072] 2) Excavate from the top of the weir body to the top surface elevation of the earth-rock backfill 3 in the lower layer in the manner of "back to the water surface first and then face the water surface";
[0073] 3) Relying on the protection of the anti-seepage wall 6 to excavate the lower earth-rock backfill 3...
Embodiment 3
[0079] Based on the cofferdam structure of the cofferdam construction method described in Example 1, the inner side of the dike 1 is filled with a slag reverse filter material 2, and the weir body surrounded by the dike 1 is filled with earth and rock backfill 3, The middle part of the earth-rock backfill 3 is poured with a cut-off wall 6 extending to the covering layer 11, the earth-rock backfill 3 above the cut-off wall 6 is provided with a composite geomembrane 7, and the top of the earth-rock backfill 3 above the composite geomembrane 7 is poured with Pressing the top 8, a wave retaining wall 9 is arranged on the side facing the water of the top pressing 8.