Construction method of annular structure for petrochemical engineering
A petrochemical and construction method technology, applied in the direction of building structure, building, building type, etc., can solve the problems of difficulty in formwork laying, mold expansion, and affecting the appearance quality of concrete ring wall molding, so as to improve the quality of concrete molding and be affected. The effect of uniform force transmission and enhanced reinforcement
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0014] The specific embodiments of the present invention will be further described below with reference to the accompanying drawings.
[0015] Such as figure 1 , figure 2 It can be seen that the method of the present invention for carrying out reinforced concrete ring wall construction using the pull ring embracing formwork reinforcement system includes the following steps:
[0016] Step 1. Install the external wall template and the internal wall template: take several pieces of 18mm thick wood board 1 and drill holes in the same height for use. The hole spacing is set to 400-500mm; the wood board 1 is uniformly numbered It is installed vertically along the ring line to form a circular outer wall and inner wall respectively.
[0017] Step 2. Set the square material: arrange two square materials 2 of 10cm*5cm on both sides of the eyehole in the vertical direction on the outer side of the outer wall and the inner wall. The distance between the two square materials is 1- 2cm to preve...