Technical resource productivity analysis method, device and equipment, storage medium
A technology of technical resources and analysis methods, applied in resources, instruments, data processing applications, etc., can solve problems such as difficult to quantify, strong subjectivity, low efficiency and accuracy of judgment, and achieve the effect of improving efficiency and accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0038] see figure 1 , which is a schematic flowchart of a method for analyzing the capacity of technical resources provided in this embodiment, the method includes the following steps:
[0039] S101: Obtain basic parameters of technical resources to be analyzed; wherein, the basic parameters include operating rates of self-owned personnel, operating rates of external employees, and task execution rates.
[0040] In this embodiment, in order to improve the efficiency and accuracy of the capacity analysis of technical resources, it is first necessary to obtain the basic parameters of the technical resources to be analyzed, so as to perform the subsequent step S102. Among them, the basic parameters may include factors that affect the production capacity of technical resources, such as the operating rate of self-owned personnel, the operating rate of external employees, and the task execution rate.
[0041] In addition, it should be noted that this application defines any technic...
no. 2 example
[0063] This embodiment will introduce a technical resource capacity analysis device, and for relevant content, please refer to the above method embodiment.
[0064] see figure 2 , which is a schematic diagram of the composition of a technical resource capacity analysis device provided in this embodiment, the device includes:
[0065] The obtaining unit 201 is used to obtain the basic parameters of the technical resources to be analyzed; the basic parameters include the operating rate of self-owned personnel, the operating rate of external employees and the task execution rate;
[0066] The first calculation unit 202 is configured to substitute the basic parameters into a pre-built capacity gap calculation formula to obtain a capacity gap calculation result of the technical resource to be analyzed;
[0067] The analysis unit 203 is configured to perform capacity analysis on the technical resource to be analyzed according to the capacity gap calculation result, and obtain an a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com