Deep foundation pit construction method for keeping underground water dynamically balanced

A construction method and dynamic balance technology, applied in infrastructure engineering, water supply installations, drinking water installations, etc., can solve the problems of underground soil structure damage, settlement of surrounding buildings, soil structure impact, etc., to reduce damage, maintain Ecological environment, high safety effect

Inactive Publication Date: 2021-01-08
CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD
View PDF4 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, there are more and more deep foundation pit problems involved in the fields of earthwork, foundation and foundation engineering. During the excavation and construction of foundation pits, groundwater seepage or gushing is often encountered. If the groundwater is not removed in time, the It is easy to cause construction accidents. In the prior art, water pumps are usually used to directly pump out the infiltrated groundwater and then drain it. However, this treatment method is easy to cause damage to the underground soil structure and cause foundation pit settlement. A large amount of groundwater also affects the soil structure of the surrounding area, causing settlement of surrounding buildings and other settings. What is more serious, it also depletes the groundwater in this area and affects the ecological environment of the area. Therefore, it is urgent to improve a Seed foundation pit groundwater treatment method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Deep foundation pit construction method for keeping underground water dynamically balanced
  • Deep foundation pit construction method for keeping underground water dynamically balanced

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The technical solution of the present invention is further described below in conjunction with the accompanying drawings, but the scope of protection is not limited to the description.

[0023] A kind of deep foundation pit construction method of keeping groundwater dynamic balance of the present invention, such as figure 1 , figure 2 shown, including the following steps:

[0024] A booster pump 1 is provided, the inlet of the booster pump 1 is connected to the suction pipe 2, and the outlet of the booster pump 1 is connected to the recharge pipe 3. During the process of excavating earth and rocks to form the foundation pit 6, at the same time, the adjacent areas around the foundation pit 6 Drilling and tapping form a plurality of water collection wells 4 and a plurality of recharge wells 5, the relative distance between the recharge wells 5 and the foundation pit 6 is greater than the relative distance between the water collection wells 4 and the foundation pit 6, an...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a deep foundation pit construction method for keeping underground water dynamically balanced. The deep foundation pit construction method comprises the following steps that a booster pump is provided, the inlet end of the booster pump is connected with a water pumping pipe, and the outlet end of the booster pump is connected with a recharge pipe; in the process of excavating earth and stone to form a foundation pit, a plurality of water collecting wells and a plurality of recharge wells are drilled and tapped in the adjacent region around the foundation pit, and the relative distance between the recharge wells and the foundation pit is larger than the relative distance between the water collecting wells and the foundation pit; and the water pumping pipe stretches into the water collecting wells, then the recharge pipe stretches into the recharge wells, and the underground water collected in the water collecting wells is recharged to the underground through the recharge wells till excavation construction of the foundation pit is finished. By the adoption of the technical scheme, the underground water gushing in the foundation pit excavation process is pumpedout in time, the pumped underground water is recharged to the region around the foundation pit in time, damage to the underground soil structure is reduced, the risk of sedimentation of the foundationpit and building facilities around the foundation pit is reduced, and the ecological environment is kept.

Description

technical field [0001] The invention specifically relates to the technical field of water conservancy engineering, in particular to a deep foundation pit construction method for maintaining the dynamic balance of groundwater. Background technique [0002] At present, there are more and more deep foundation pit problems involved in the fields of earthwork, foundation and foundation engineering. During the excavation and construction of foundation pits, groundwater seepage or gushing is often encountered. If the groundwater is not removed in time, the It is easy to cause construction accidents. In the prior art, water pumps are usually used to directly pump out the infiltrated groundwater and then drain it. However, this treatment method is easy to cause damage to the underground soil structure and cause foundation pit settlement. A large amount of groundwater also affects the soil structure of the surrounding area, causing settlement of surrounding buildings and other setting...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D19/10E02D19/06E03B3/10E02D3/10
CPCE02D3/10E02D19/06E02D19/10E03B3/10
Inventor 吕康向贤镜严成斌王明李刚孙楠俞灵光石文杰杨曼陈琰陈小东袁强文浩杨盛熊雨扬王杰
Owner CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products