Combined bridge structure convenient for passing of oil tanker in offshore area
An offshore and combined bridge technology, applied in the direction of bridges, suspension bridges, bridge forms, etc., can solve the problems of falling, cost, time, labor, danger, etc., and achieve the effect of reducing the distance.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] refer to Figure 1-5 , a composite bridge structure convenient for oil tankers to pass in the near-sea area, comprising a bridge pier body 1 and a bridge tower 10 with an H-shaped structure on the upper surface of the pier body 1 located in the middle of the river, and a support frame 21 is fixed on the upper surface of the pier body 1 , and the top of the support frame 21 at the top of the pier body 1 in the middle is placed with an intermediate bridge 16, the top of the bridge tower 10 is reserved with a tower beam 11, and the top of the pier body 1 near the bottom of the end of the intermediate bridge 16 has two openings. Mounting holes, and hydraulic push rods 19 are fixed by bolts in the two mounting holes, and the top of the pier body 1 adjacent to the middle pier body 1 is provided with two fixed columns, and between the fixed columns and the bridge tower 10 Two C-shaped steel slide rails 3 with opposite openings and parallel to each other are fixed, T-shaped sli...
Embodiment 2
[0041] refer to figure 1 and Figure 4 , a combined bridge structure that facilitates the passage of oil tankers in the coastal area. Compared with Embodiment 1, this embodiment also includes rotating shafts 801 distributed equidistantly on the groove bottom of the arc rail 8, so that it can be used as a steel wire rope when in use. 7 can convert the sliding friction with the inner wall of the arc-shaped rail 8 into rolling friction during the pulling process, and there is no need to contact the inner wall of the arc-shaped rail 8 to avoid drawing the inner wall of the arc-shaped rail 8 out of the groove.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


