Satellite resource dynamic scheduling method based on solution set construction and pheromone deposition
A resource scheduling and dynamic scheduling technology, applied in the field of satellite communication networks, can solve the problems of slow planning speed and high implementation complexity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0074] In order to better understand the contents of the present invention, an example is given here.
[0075] This embodiment discloses a method for dynamic scheduling of satellite resources based on disassembly structure and pheromone deposition. figure 1 The flow chart of this method comprises the following steps:
[0076] S1, taking satellite resources, channel resources, and time slot resources as resource scheduling objects, and constraining time window constraints, satellite energy consumption constraints, channel quantity constraints, ground user priorities, and communication bursts, etc., to establish a system resource scheduling model ;A time window contains several time slots;
[0077] S2. On the basis of the system resource scheduling model, a low-orbit satellite resource scheduling model is established with the goal of ground mission service quality and the total energy consumption of the low-orbit satellite system;
[0078] S3, initialize the visible low-orbit ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com