Gauge-changeable bogie and railway vehicle
A bogie and gauge technology, applied in bogies, railway car body parts, vehicle parts, etc., can solve problems such as reliability and serviceability need to be improved, locking mechanism affects vehicle running quality, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] This embodiment discloses a railway vehicle, which includes a variable-gauge bogie.
[0044] figure 1 It is a structural schematic diagram of the variable-gauge bogie of the present embodiment, figure 2 for figure 1 The schematic diagram of the top view, image 3 for figure 1 A schematic side view of the combined Figure 1-Figure 3 , the variable gauge bogie of the present embodiment comprises two wheelsets to form 1, four sets of axle positioning devices 2, a frame, a bolster to form 4, a set of braking device 5, two lower side bearings 6 and Two sets of central spring suspension damping devices 7 etc. are formed, wherein, the frame of the present embodiment comprises two side frames to form 3 .
[0045] Figure 4 It is a structural schematic diagram of the braking device of this embodiment, combined with Figure 4 In this embodiment, the braking device 5 adopts four sets of caliper braking units 51, and the caliper braking units 51 are assembled on the braking...
Embodiment 2
[0061] The difference between the second embodiment and the first embodiment is that the second embodiment does not set the clamping hoop 22, Figure 9 It is the structural intention of another implementation of the wheel axle positioning device of this embodiment, combining Figure 9 , in this case, the central angle of the first positioning opening is less than or equal to 180°, the bearing saddle 22 is connected to the side frame composition 3 of the frame on the same side through a flexible piece 26, and the flexible piece 26 can be in the form of a chain, a steel cable, etc. , has a certain amount of looseness. In this case, the bearing saddle 21 is not loaded and unloaded together with the wheel axle composition. When the wheel axle composition 1 is in place, the wheel axle composition 1 is placed within the correct range through the cooperation of the bearing saddle 21 and the positioning block 23.
Embodiment 3
[0063] Based on the above-mentioned railway vehicle with gauge-changing bogies, this embodiment also discloses a method of gauge-changing railway vehicles.
[0064] Figure 10 It is a schematic diagram of the system used by a method for changing the gauge of railway vehicles in this embodiment, combined with Figure 10 , the system used in a method for changing the gauge of railway vehicles in this embodiment includes a train system 100, an axle storage system 200, an unloading axle system 300, and a push system 400, wherein: the vehicle 110 in the train system 100 is equipped with the above-mentioned rapid The bogie 111 of the unloaded axle composition 1; the axle warehouse system 200 is a three-dimensional intelligent warehouse for classifying and storing the axle composition 1; the unloading axle composition 1 is unloaded from the vehicle 110 and transmitted to the axle warehouse system 200 for storage. Or take out the axle assembly 1 from the axle storage system 200, and ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


