Pipe arranging equipment for racking platform of workover rig
A technology of two-story platform and workover rig, applied in drilling equipment, drill pipe, casing, etc., can solve the problems of large swing range of pipe string, shortened service life, large motor load, etc. Service life, effect of reducing load
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0060] The present invention will be described in further detail below in conjunction with specific examples, but the embodiments of the present invention are not limited thereto.
[0061] See figure 1 , figure 2 , image 3 , Figure 4, a pipe arrangement equipment for a workover rig on the second floor, comprising: a camera 1, a travel track 2, a travel drive assembly 3, a travel base 35, a rotary table 4, a plurality of universal balls 5, a rotation drive assembly 6, and a telescopic drive Part 7 and jaw assembly 8. The traveling track 2 is fixed above the tongue plate 9 of the second floor platform 33 of the workover rig, and the major axis of the traveling track 2 extends along the major axis direction of the tongue plate 9 . The running track 2 is parallel to the tongue plate 9, and the two ends of the running track 2 are fixedly connected to the two ends of the tongue plate 9 through the first connecting piece and the second connecting piece. The walking base 35 is...
PUM