Automatic floor tile laying equipment for constructional engineering
An automatic laying and construction engineering technology, which is applied in the direction of architecture and building construction, can solve the problems of low laying efficiency and high work intensity, and achieve the effect of low laying efficiency, high labor intensity and improved laying effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Such as figure 1 As shown, the embodiment of the present invention provides an automatic laying equipment for floor tiles for construction engineering. The automatic laying equipment includes a laying board 5, and the laying board 5 is slidably installed in a sliding mechanism, and the sliding mechanism passes through a fixed assembly fixed on the indoor wall; the front of the laying board 5 is provided with an empty slot 12, and a position adjustment mechanism is arranged in the empty slot 12, and the position adjustment mechanism is connected with the motor box 17 through a horizontal automatic telescopic rod 16, so that The inside of the motor box 17 is equipped with a direction rotation mechanism that is connected to the lifting and grabbing laying mechanism on the upper surface of the motor box 17; strike mechanism.
[0029] The automatic floor tile laying equipment for construction projects can be used for interior decoration of construction projects. It has a hi...
Embodiment 2
[0041] Such as Figure 5 As shown, in another embodiment provided by the present invention, the automatic beating mechanism includes a second automatic telescopic rod 29, one end of the second automatic telescopic rod 29 is connected to the bottom of the laying board 5, and the The other end of the second automatic expansion rod 29 is fixed with a hammer pressing plate 30, the bottom of the hammer pressing plate 30 is evenly fixed with a hammer pressing bar 31, and the top of the hammer pressing bar 31 is sleeved with a hammer pressing ball 32, the laying Mounting bases 33 are installed on the opposite surfaces of the plate 5 and the hammer pressing plate 30 respectively, and folding arms 34 are hingedly installed in the two mounting bases 33 respectively, and the two folding arms 34 are movably connected by pivot pins.
[0042] After the floor tiles are laid on the ground, start the second automatic telescopic rod 29 to extend, and when the second automatic telescopic rod 29 ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


