Rising and falling beam operation method for synchronous jacking of beam bodies
A technology of simultaneous jacking and operation method, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of beam length, internal damage, and uneven force on the beam, so as to avoid uneven force and reduce safety accidents. The probability of occurrence, the effect of accelerating the cylinder extension speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0024] see Figure 1-3 , the present invention provides a technical solution: a lifting beam operation method for synchronous jacking of the beam body, including a jacking mechanism 9, the operation method of the lifting beam for synchronous jacking of the beam body is operated by the jacking mechanism 9, and the jacking mechanism 9 The lifting mechanism 9 includes a plurality of pier bodies 10, and the upper side of the pier body 10 is provided with pouring grooves 11. The number of the pouring grooves 11 is four, and the four pouring grooves 11 are distributed in a rectangular shape. In the pouring grooves 11 An anchor bolt 13 is placed, and the upper end of the anchor bolt 13 is located on the upper side of the pouring trough 11, and the concrete 12 is poured in the pouring trough 11, and the anchor bolt 13 is fixed, and the upper side of the pier body 10 is placed with a steel Backing plate 15, four through holes 16 are opened on the edge of the steel backing plate 15, the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 