A continuous multi-span factory building foundation structure and construction method
A plant foundation and pile foundation technology, which is applied in the direction of foundation structure engineering, construction, protection devices, etc., can solve problems such as foundation settlement, and achieve the effects of avoiding settlement, improving mechanical properties, and improving stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] Such as Figure 1-Figure 2 As shown, a continuous multi-span factory building foundation structure includes several pile foundations 4 and corresponding drainage pipes 1, and concrete is poured between each pile foundation 4 to form a concrete layer 2;
[0037] The pile foundation 4 is a hollow structure, one end of the drainage pipe 1 communicates with the pile foundation 4, and the other end protrudes from the ground. The pile foundation 4 includes an annular side wall and a bottom, and a central column is arranged inside the annular side wall 6. The bottom end of the central column 6 is connected to the bottom of the pile foundation 4, and the annular side wall is sequentially composed of the first concrete layer, the first buffer layer and the second concrete layer from bottom to top, and the central column 6. From bottom to top, there are the third concrete layer, the second buffer layer and the fourth concrete layer. The top of the central column 6 and the annular...
Embodiment 2
[0050] Such as Figure 1-Figure 2As shown, this embodiment is based on Embodiment 1, and the concrete layer 2 is poured twice to form a lower concrete layer and an upper concrete layer respectively, and the lower concrete layer and the upper concrete layer are connected by a steel connector 3; The reinforcing bar connecting body 3 includes a first transverse reinforcing bar and a second transverse reinforcing bar, the first transverse reinforcing bar and the second transverse reinforcing bar are respectively embedded in the lower concrete layer and the upper concrete layer, and the first transverse reinforcing bar and the second transverse reinforcing bar are connected by multiple vertical steel bars;
[0051] The pouring process of the concrete layer 2 is as follows:
[0052] The lower concrete layer is poured first, and the steel bar connector 3 is embedded in the pouring project. After the lower concrete layer is poured, the upper part of the vertical reinforcement and the...
Embodiment 3
[0057] Such as Figure 1-Figure 2 As shown, this embodiment is based on Embodiment 1 or Embodiment 2. The top cover includes several cover plates 7 in a fan-shaped structure, and two adjacent cover plates 7 are connected by a radial buffer layer 8; the radial The buffer layer 8 is an asphalt layer.
[0058] In this embodiment, the top cover is provided with several fan-shaped cover plates 7, and two adjacent cover plates 7 are connected by a radial buffer layer 8, and the buffer layer 8 has certain deformation resistance. It can improve the compressive capacity of the top cover.