Ballastless track roadbed slab connecting structure and construction method
A ballastless track and connecting structure technology, applied in tracks, roads, ballast layers, etc., can solve problems such as slow construction efficiency and achieve the effect of improving construction speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0057] In the second aspect, the present invention also provides a first embodiment of a ballastless track track bed slab construction method, the method includes the following steps:
[0058] Step S100 , forming a support layer 100 . Wherein, at least one first connecting hole is formed on the top surface of the supporting layer 100, and the pin connecting member 300 is fixedly connected in the first connecting hole.
[0059] In this step, when the supporting layer 100 is an invert section, it may be a common invert section or a prefabricated invert section of a tunnel. After the support layer 100 is formed, at least one first connection hole is formed on the top surface of the support layer 100 . For example, when the pin connector is a sleeve, the open end of the matching hole of the pin connector can be sealed by a sealing cover or a sealing plug. The sealing plug or sealing cap can be made of highly flexible rubber. And the sealing plug or the sealing cover can be deta...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com


