A technology of water pipeline and installation method, which is applied in the directions of pipes/pipe joints/fittings, pipe laying and maintenance, mechanical equipment, etc., can solve the problems of increasing construction costs, pipe layout and installation, etc., and achieve the effect of saving construction costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] Example 1, such as Figures 1 to 2 As shown, the structure of the closing section of the large-diameter PCCP water pipeline includes closing port 5, front-end pipeline 6, back-end pipeline 7, front-end track 8, back-end track 9 and accompanying road 10; front-end pipeline 6 and back-end pipeline 7 are both straight lines Pipeline, the front-end pipeline 6 and the rear-end pipeline 7 are arranged at an angle, and there is a gap at the intersection of the front-end pipeline 6 and the rear-end pipeline 7 to form a closing port 5; the front-end track 8 is distributed along the axis of the front-end pipeline 6 in the front-end pipeline 6 On both sides of the rear-end pipeline 7, the rear-end track 9 is distributed on both sides of the rear-end pipeline 7 along the axis of the rear-end pipeline 7; Accompanying road 10; the end of the front end track 8 located at the closing port 5 is connected with a deflection track 11 that is offset to the side of the accompanying road 10 a...
Embodiment 2
[0034] Embodiment 2, the installation method of the large-diameter PCCP water pipeline closing section pipe layout, including the first step: select the position of the closing pipe in the pipeline, and use the inflection point of the pipeline as the closing section; the second step: reserve the space for installing the closing pipe Closing mouth 5; Step 3: Lay the front track 8 forward along the reserved closing mouth 5, and lay the rear track 9 backward; Step 4: erect the gantry through the rear track 9, facing or away from the closing mouth 5 Install the PCCP pipes sequentially in the direction to form the back-end pipeline 7; the fifth step: erect the gantry through the front-end rail 8, install the PCCP pipes in sequence toward the reserved closing port 5, and reserve the last one to two PCCP pipe joints; Step 6: At the opening 5, extend and deflect the front-end track 8 so that the formed deflection track 11 bypasses the port of the rear-end pipeline 7; Step 7: The bendin...