Unlock instant, AI-driven research and patent intelligence for your innovation.

Extensible substation maintenance work invoice generation method based on lookup table

A work ticket and substation technology, applied in the field of scalable substation maintenance work ticket generation, can solve the problems of manual work ticket issuance

Inactive Publication Date: 2021-07-02
STATE GRID JIANGSU ELECTRIC POWER CO LTD NANTONG POWER SUPPLY BRANCH
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide a solution to the problem that billing personnel need to manually issue work tickets, aiming to automatically generate work tickets accurately and quickly by computer

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Extensible substation maintenance work invoice generation method based on lookup table
  • Extensible substation maintenance work invoice generation method based on lookup table
  • Extensible substation maintenance work invoice generation method based on lookup table

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] Specific embodiments of the present invention will be further described below in conjunction with the accompanying drawings.

[0020] A look-up table-based method for generating work tickets for extensible substation maintenance, including the following steps: Step 1. Design and analysis of work ticket generation rule table: From the self-designed work ticket generation rule table, extract "circuit breaker-power outage interval", "Break circuit - work content", "barrier sign - power failure interval", "blocking indication - work content", "grounding - power failure interval", "grounding - work content" related attributes, record them as rule table items, and the content structure of the rule table Such as image 3 As shown, the subtable structure is as follows Figure 5-Figure 10 As shown, each row of the rule table represents a security measure, and users can expand it according to the actual situation;

[0021] Step 2 Load the work schedule, extract sub-items for an...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an extensible substation maintenance work invoice generation method based on a lookup table. The method comprises the following steps: designing, inputting and analyzing a work invoice generation rule table; analyzing the work schedule; and performing work invoice reasoning. By analyzing the power failure intervals and the relationship between the work tasks and the work invoices, the mapping relationship between the work plans and the work invoice safety measures under the conditions of different power failure intervals, equipment and work tasks is established, and based on the mapping relationship, the computer can simulate the invoicing personnel to analyze the work plan table and infer to obtain the safety measures. When an invoicing person needs to issue a work invoice, the work of issuing the work invoice can be completed only by uploading the work plan table and selecting the index of the corresponding work plan needing to issue the work invoice, and the method has the advantages of convenience, high efficiency and accuracy, effectively solves the problems of repeated invoicing, time consumption and low efficiency of the invoicing person, so that intelligent management of the platform is facilitated.

Description

technical field [0001] The invention relates to a method for generating an extensible substation maintenance work ticket based on a lookup table. Background technique [0002] As the main organizational measures and technical measures to ensure safe work, electrical work tickets play an important role in the management and control of electric power safety production, and have become the most basic measures and means for electric power production personnel to carry out electrical work. The work ticket is mainly composed of four main parts: "work equipment and its dual names", "work tasks", "safety measures", and "shielding signs". But first of all, due to the lack or deviation in the understanding of work tickets, many problems such as inadequate implementation of on-site organizational measures and unsound safety technical measures have been caused, resulting in personal, power grid and equipment accidents from time to time. It has caused irreparable losses to power compani...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q10/00G06F16/901G06Q50/06
CPCG06Q10/0631G06Q10/20G06Q50/06G06F16/9017Y04S10/50
Inventor 丁雪峰顾明煜孙晓威黄金鑫赵军蔡云清夏顾锋丁玮沈伟吴俊杰
Owner STATE GRID JIANGSU ELECTRIC POWER CO LTD NANTONG POWER SUPPLY BRANCH