Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Bridge maintenance decision-making method based on dynamic programming method

A technology of dynamic programming and decision-making methods, applied in the direction of instruments, data processing applications, resources, etc., can solve problems such as the difficulty of decision-making for maintenance and repair of bridge clusters in cities with workload

Pending Publication Date: 2021-07-06
CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The ever-increasing workload and complexity also make the maintenance and repair decisions of urban bridge clusters more difficult. How to better complete bridge maintenance work under the condition of limited resources is also a challenge that urban bridge managers must face

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bridge maintenance decision-making method based on dynamic programming method
  • Bridge maintenance decision-making method based on dynamic programming method
  • Bridge maintenance decision-making method based on dynamic programming method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0054] In order to make the purposes, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments It is a part of the embodiments of this application, but not all of them. Based on the embodiments in the present application, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present application.

[0055] The embodiment of the present application provides a bridge maintenance decision-making method based on the dynamic programming method, which can better complete the bridge maintenance work under the condition of limited resources.

[0056] see figure 1 As shown, the embodiment of the present application provides a bridge mainte...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a bridge maintenance decision-making method based on a dynamic programming method, and the method comprises the following steps: obtaining the comprehensive deducted score of m types of components based on the deducted score of m types of components of a bridge, the weight of an inspection item, and the weight of an inspection component, and m is the total number of divided component types of the bridge; obtaining comprehensive maintenance cost of various components of the bridge; establishing a maintenance income matrix of the bridge based on the maintenance fund of the bridge unit, the comprehensive deducted score of each component, the comprehensive maintenance cost and the maintenance reduction coefficient; and dividing the total amount of bridge maintenance funds into m stages for distribution, establishing a bridge dynamic planning basic equation and a first boundary condition, and solving and obtaining an optimal distribution sequence when the total amount of bridge maintenance funds is distributed to m types of components in combination with the maintenance income matrix of the bridge. According to the method, the bridge maintenance work can be better completed under the condition of limited resources.

Description

technical field [0001] This application relates to the technical field of bridge engineering management, maintenance and repair, in particular to a bridge maintenance decision-making method based on a dynamic programming method. Background technique [0002] In recent years, as the service time of urban bridges has increased year by year, the phenomenon of vehicle overloading on bridges has frequently occurred, and some bridges that have been in service for a long time or even newly built bridges have begun to have problems with increased disease development. If it cannot be repaired in time, it will lead to rapid deterioration of the disease and eventually lead to bridge safety accidents. [0003] At the same time, with the continuous increase of urban traffic demand, the number of urban bridges is increasing year by year, and the number of bridges that need to be managed and maintained is also increasing. Bridges are composed of various components, and their maintenance wo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/00G06Q50/08
CPCG06Q10/06313G06Q10/20G06Q10/0639G06Q50/08
Inventor 姚文凡王亚飞钟继卫叶仲韬李成许钊源胡俊亮刘金龙李泽新池玉辰徐有良彭晨曦刘凯
Owner CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products