Quick connecting structure between prefabricated pier column and base and construction method

A technology for quick connection and prefabrication of piers, applied in bridge parts, erection/assembly of bridges, bridges, etc., can solve the problems of grouting quality, compactness inspection, increase the difficulty of quality control, increase the construction process and time, etc., to achieve construction quality Good, the construction quality is easy to guarantee, and it is beneficial to the effect of engineering promotion and application

Pending Publication Date: 2021-07-16
CHINA RAILWAYS CORPORATION +1
View PDF14 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] 2. The construction speed is slow. During the construction, the steel bars need to be inserted into the pre-buried grouting sleeve and bellows one by one, and then grouted one by one, which increases the construction process and time
[0006] 3. Quality control is difficult, because the grouting sleeve or bellows is located inside the structure, it is difficult to check the grouting quality and compactness, and the connection performance of the structure depends entirely on the grouting effect, which increases the difficulty of quality control
[0007] 4. When the grouting sleeve or corrugated pipe is pre-embedded in the base, each grouting sleeve or corrugated pipe needs to be provided with a grouting port and a grouting port, and it is necessary to use pipes to lead them out of the structure one by one. complex

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Quick connecting structure between prefabricated pier column and base and construction method
  • Quick connecting structure between prefabricated pier column and base and construction method
  • Quick connecting structure between prefabricated pier column and base and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0043] It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.

[0044]In describing the present invention, it should be understood that the terms "center", "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", " The orientations or positional relationships indicated by "vertical", "horizontal", "top", "bottom", "inner" and "outer" are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and Simplified descriptions, rather than indicating or implying that the device or element referred to must have a particular orientation, be constructed and operate in a particular orientation, and thus should not be construed as limiting the invention. In addition, the terms "first", "second", etc. are used for descriptive purposes only, and should not be understood a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a quick connecting structure between a prefabricated pier column and a base and a construction method. The quick connecting structure comprises the prefabricated pier column and the base, a post-pouring groove and a connecting column are arranged at the upper part of the base, and concave-convex shear keys are arranged on the side walls of the post-pouring groove and the connecting column; the anti-shearing pin is arranged at the top of the connecting column, is positioned in the center of the connecting column and consists of an anti-shearing steel plate, an anti-shearing steel bar and concrete; the prefabricated pier column is composed of a pier column body, a pier column main rib and a shear-resistant pin groove, and the pier column main rib is pre-buried in the pier column body and penetrates out of the bottom of the pier column body. The pier column body and the connecting column are connected through the splicing seam, the pier column main rib extends into the post-pouring groove of the base, and a post-pouring belt is poured. The connecting structure is low in connecting precision requirement, large in construction allowable error, high in construction speed, easy in quality guarantee, simple in structure, low in cost and high in joint shear resistance, and quick connection between the prefabricated pier column and the base is achieved. Meanwhile, the cost is low, and engineering application and popularization are facilitated.

Description

technical field [0001] The invention relates to the field of bridge construction, in particular to a quick connection structure between a prefabricated pier column and a base and a construction method. Background technique [0002] In recent years, as the country has increased investment in infrastructure, a large number of bridge projects have been constructed in railways, highways, and municipal roads. At the same time, new construction models such as green construction and intelligent construction have continued to advance, and the prefabricated assembly construction technology of bridge piers has attracted widespread attention. When the pier is prefabricated, the pier column is prefabricated in the factory, and the prefabricated pier column is transported to the site for assembly. There is a joint between the pier column and the base. The strength of the joint and the speed of construction will directly affect the performance and construction of the bridge pier. speed. ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01D19/02E01D21/00
CPCE01D19/02E01D21/00
Inventor 孙树礼苏伟张帅杜宝军
Owner CHINA RAILWAYS CORPORATION
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products