Unlock instant, AI-driven research and patent intelligence for your innovation.

Project multi-party collaborative management system and method based on Internet

A collaborative management and project management technology, applied in the field of Internet-based project multi-party collaborative management system, can solve the problems of difficult project application promotion, many responsibility disputes, and difficult to provide, so as to achieve the effect of tracking and confirmation

Pending Publication Date: 2021-07-30
金坤建设集团有限公司
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Adopting the construction project management model centered on the project management model can effectively enhance the accuracy and efficiency of information transmission in the project process, but it is difficult to provide a set of fair methods to measure and evaluate the contributions and value issues of all parties in the whole process of the project. Incentives, so the application of projects based on multi-party collaboration has the disadvantages of difficulty in advancing and more disputes over responsibilities

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project multi-party collaborative management system and method based on Internet
  • Project multi-party collaborative management system and method based on Internet

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0050] Embodiment 1: as figure 1 As shown, Embodiment 1 provides an Internet-based project multi-party collaborative management system, the system includes: a decision-making application layer, a project management information integration layer, a blockchain layer, and a data support layer;

[0051]The Internet-based project multi-party collaborative management system is the core platform for producing and processing construction project business data. It provides services for various platform clients and users for different participants and stages, and also provides data sources for the analysis platform. The Internet-based project multi-party collaborative management system has a layered structure, including data support layer, project management information integration layer, blockchain layer, and decision-making application layer 4 layers from bottom to top.

[0052] The data support layer is connected to multiple terminal devices, and is used to build a project management...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a project multi-party collaborative management system and method based on the Internet. The system comprises a decision application layer, a project management information integration layer, a block chain layer and a data support layer. The data support layer is connected with a plurality of terminal devices and is used for constructing a project management model suitable for multi-level scheduling integrated distributed computing according to pre-collected terminal device information; the project management information integration layer is used for performing data management on the information of the project management model; the block chain layer is used for sequentially performing local and global verification on the project management model, and carrying out distributed storage and redundant backup on the project management model passing the verification; and the decision application layer is used for calling the project management model information of the block chain layer according to different requirements of the application. According to the scheme, multi-party cooperation, benefit balance, lossless information transmission and responsibility tracing in project management are realized, and a support framework and an implementation thought of project management and a block chain technology in a construction project are analyzed from the perspective of a full life cycle.

Description

technical field [0001] The invention relates to the technical field of computer communication, in particular to an Internet-based multi-party collaborative management system for projects and an implementation method thereof. Background technique [0002] The multi-party collaborative management of Internet projects has the problem of highly dispersed information and extremely serious waste. In traditional projects, the stages of planning, design, construction, and operation are independent of each other, and the interests of each project participant are relatively independent. During the management process, the game of interests is prominent, and information compatibility is difficult, resulting in large information loss and duplication of work. Interference with operations management. The project management model BIM is known as the next generation of intelligent computer-aided design. It is not only a complete three-dimensional space and multi-dimensional information mode...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10
CPCG06Q10/103G06Q10/101
Inventor 王建伟杨明周明霞毛土昌王才富
Owner 金坤建设集团有限公司