Novel steel negative ring pipe structure for shield construction
A kind of technology of negative ring tube and negative ring segment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] refer to Figure 1-8 , a new type of steel negative ring pipe structure for shield construction, including a support base 1, a power supply 3 is provided inside the support base 1, a plurality of negative ring segments 2 are provided on the upper end of the support base 1, and the negative ring segment 2 Made of reinforced concrete, each negative ring segment 2 is provided with a hanging ring 25 on the side away from the support pipe 8, which is convenient for lifting the negative ring segment 2, and multiple negative ring segments 2 are spliced together to form a negative ring tube , the negative ring tube is provided with a plurality of support tubes 8, the front side of the plurality of support tubes 8 is provided with the second annular plate 9, the rear side of the plurality of support tubes 8 is provided with the first annular plate 7, and the plurality of support tubes 8 are provided with the first annular plate 7. The front side of the pipe 8 is provided with ...
Embodiment 2
[0042] refer to Figure 9-10 The difference between this embodiment and Embodiment 1 is that each negative ring segment 2 is provided with a first buffer pad 23 on the side close to the support tube 8, and the outer wall of the support tube 8 is provided with the first buffer pad. 23 to match the second buffer pad 24, one side of the second buffer pad 24 on each support tube 8 is always in contact with the first buffer pad 23.
[0043] In this embodiment, in the process of grouting or pouring concrete, since the first buffer pad 23 and the second buffer pad 24 are provided between the negative ring segment 2 and the support pipe 8, the slurry or concrete will be placed on the negative ring during the pouring process. The pressure of the ring segment 2 can be buffered to a certain extent, so that the damage of the negative ring segment 2 can be avoided during the process of grouting or concrete injection.
[0044] Compared with the prior art, since the first buffer pad 23 and ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


