Cutting device and method for nailed geomembrane
A cutting device and geomembrane technology, applied in metal processing and other directions, can solve the problems of low cutting accuracy, affecting the quality of concrete pouring, and inability to embed geomembrane trimming, etc., and achieve the effect of saving labor costs and time costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] The invention provides a method for precisely cutting a 2m*6m size embedded geomembrane membrane block, including:
[0055] Step 1. Manufacture the splicing unit of the cutting tool according to the cutting size requirements, that is, the width is 1 / 2H=1m, and the length is 1 / 2L=1.5m.
[0056] Step 2. Clean up the cutting platform to ensure that the cutting operation platform is clean, dry, firm and flat, without unevenness, sundries and sharp objects, without slope, and the space should not be less than 4m*8m.
[0057] Step 3. Flatten the nail-embedded geomembrane and place it on the cutting platform, with the nail-embedded side facing down. After the nail-embedded geomembrane is flattened, it should be flat and free of warped edges. Flatten and compact the nail-embedded geomembrane The film width is 2.44m (width), and its length should be 7m.
[0058] Step 4. Splice the four cutting tool splicing units to obtain a cutting tool with a size of H=2m and L=3m; fix the tw...
Embodiment 2
[0063] The invention provides a method for precisely cutting a 2.44m*3.352m size embedded geomembrane membrane block, including:
[0064] Step 1. Manufacture the splicing unit of the cutting tooling according to the cutting size requirements, that is, the width is 1 / 2H=1.22m, and the length is 1 / 2L=1.676m;
[0065] Step 2. Clean up the cutting platform to ensure that the cutting operation platform is clean, dry, firm and flat, without unevenness, sundries and sharp objects, without slope, and the space should not be less than 5m*5m;
[0066] Step 3. Flatten the nail-embedded geomembrane and place it on the cutting platform, with the nail-embedded side facing down. After the nail-embedded geomembrane is flattened, it should be flat and free of warped edges. Flatten and compact the nail-embedded geomembrane The film width is 2.44m, and its length should be 4m;
[0067] Step 4. Splicing the four cutting tool splicing units to obtain a cutting tool with dimensions H=2.44m and L=3...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com