Urban rail transit equipment facility deformation early warning system
A technology of urban rail transit and early warning system, applied in the field of urban rail transit equipment and facilities deformation early warning system, can solve the problems of insufficient comprehensiveness and achieve low cost effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Install train pressure sensors, train displacement sensors, ground equipment pressure sensors, and ground equipment displacement sensors on the equipment and facilities that require monitoring and early warning on the train and the ground, and the pre-set data at the early warning master control terminal is normal.
Embodiment 2
[0028] The train pressure sensor and train displacement sensor detect the train pressure and train displacement data, and transmit the data to the train AD signal converter. The train AD signal converter converts the voltage signal into a digital signal and transmits it to the train data receiving device; ground equipment pressure sensor and ground The equipment displacement sensor detects the ground equipment pressure and ground equipment displacement data, and transmits the data to the ground AD signal converter. The ground AD signal converter converts the voltage signal into a digital signal and transmits it to the ground data receiving equipment.
Embodiment 3
[0030] The train data receiving equipment and the ground data receiving equipment transmit the data to the data integration unit for data sorting, and the sorted data is transmitted to the early warning master control terminal for analysis and judgment, and whether the train pressure data and train displacement data exceed the preset value, the train pressure If the data and train displacement data do not exceed the preset value, no operation will be performed. If the train pressure data exceeds the preset value, a train pressure exceeding warning will be given. If the train displacement data exceeds the preset value, a train displacement exceeding warning will be performed. The ground equipment pressure data and ground Whether the equipment displacement data exceeds the preset value is judged. If the ground equipment pressure data and ground equipment displacement data do not exceed the preset value, no operation is performed. If the ground equipment pressure data exceeds the p...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com