Method for achieving synchronous pushing of large-span steel-concrete composite beams through cable-stayed tower
A cable-stayed tower and long-span technology, which is applied in erecting/assembling bridges, bridges, bridge construction, etc., can solve problems such as stress concentration at the connection between the bottom of the tower and the top of the steel box girder
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the drawings in the embodiments of the present invention. Apparently, the described embodiments are only some of the embodiments of the present invention, but not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
[0036] Please refer to Figure 1 to Figure 10 , a preferred embodiment of the present invention provides a method for using a cable-stayed tower to solve the synchronous jacking of a large-span steel-concrete composite beam, including the following steps:
[0037] S1. Arrange the splicing area 1, intermediate pier 2 and guide beam receiving platform 3 in the construction area, and respectively arrange the pushing device 6 on the splicing area 1, intermediate...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com