A prefabricated green building and construction method

A green building and prefabricated technology, applied to buildings, building components, building structures, etc., can solve problems affecting work efficiency, time-consuming disassembly and assembly, and staff fatigue, so as to achieve stable wall installation and increase the contact area , the effect of reinforced installation

Active Publication Date: 2022-08-02
深圳市德泰建设工程有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In view of the current related technology, the inventor believes that when installing traditional walls, bolts or long screws are usually used to install adjacent walls together, but this installation method is time-consuming and laborious when disassembling. If the project volume is large, it will not only easily bring fatigue to the staff, but also affect work efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A prefabricated green building and construction method
  • A prefabricated green building and construction method
  • A prefabricated green building and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The present application will be further described in detail below with reference to the accompanying drawings.

[0037] The embodiment of the present application discloses a prefabricated green building, such as figure 1 and figure 2 As shown, it includes: a first wall body 1 and a second wall body 2 that are detachably installed adjacently, and a positioning component is provided between the top of the first wall body 1 and the bottom of the second wall body 2, when the first wall body 1 is installed and the second wall body 2 is installed. When a wall body 1 and a second wall body 2 are used, the positioning component can position both of them, so as to realize precise installation.

[0038] In this embodiment, the positioning assembly includes: a bar-shaped groove 10 and a positioning bar 20. The bar-shaped groove 10 is opened on the top of the first wall body 1 along the extending direction of the top of the first wall body 1, and the positioning bar 20 is provide...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The present application discloses a prefabricated green building and a construction method, comprising: a first wall body and a second wall body that are detachably installed adjacently; A positioning assembly for positioning the two; a mounting block vertically installed on both sides of the first wall; a rod installed on both sides of the second wall that matches the mounting groove on the mounting block; and installed in the mounting block Fixing assembly for fixing the plunger. When the present application is in use, the disassembly and assembly of the prefabricated wall can be easily realized, so that the work efficiency can be effectively improved.

Description

technical field [0001] The invention relates to the field of prefabricated buildings, in particular to a prefabricated green building and a construction method. Background technique [0002] Green buildings are relatively popular buildings nowadays. They are mainly buildings that coexist harmoniously with nature by saving resources, protecting the environment and reducing pollution. With the continuous development of society, prefabricated buildings have appeared in recent years. On the basis of environmental protection, the efficiency of building assembly is improved. [0003] At present, some outdoor temporary buildings usually need to be assembled in the construction site or in the supervision of some forest areas. In order to improve efficiency, people usually prefabricate some easy-to-install walls in the workshop in advance. These walls are usually mixed with some Green environmental protection materials and some thermal insulation materials to improve the comfort of ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E04B2/00E04G21/14E04G21/16
CPCE04B2/00E04G21/14E04G21/167
Inventor 车明晗
Owner 深圳市德泰建设工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products